We conducted a thorough survey and confidently selected the Worcester Greenstar 24RI heat-only boiler, which fully met the heating and hot water demands. This was a straightforward direct replacement.
Some pipework in the airing cupboard had to be altered to suit the new boiler. We also fitted a Greenstar system filter to protect the boiler. All the other controls were left the same. The system was power flushed, and an inhibitor was put into it to condition and protect the water. Overall, the new boiler in Maidenhead took about one day to complete.
We also fitted out their new cloakroom.
They will now receive a 10-year manufacturer-backed guarantee from Worcester, providing peace of mind that their boiler will be reliable for years.
If you would like us to provide a free quotation for a New boiler in Maidenhead, contact us now at [email protected]
We carried out a survey and discussed the options available. Mr B decided on a Worcester Greenstar 2000 30kw combination boiler which was more than adequate for the heating and hot water demands.
The old Warm air unit was decommissioned and hot water cylinder removed.
The pipework in the airing cupboard had to be altered to suit the new boiler, and the old hot water cylinder removed. We also fitted a Greenstar system filter to protect the boiler and a Worcester comfort 2 Thermostat. Pipework was run into each room and 6 new radiators were fitted the system was powerflushed and an inhibitor was put into the system to condition and protect the water.
Mr B will now get a 6 years manufacturer backed guarantee from Worcester and peace of mind his boiler will be good for years.
If you would like us to provide a free quotation for a New Worcester boiler in Windsor, contact us now at [email protected]
or get an instant Boiler Quote
We carried out a survey and discussed the options available. He decided on a Worcester Greenstar 18RI heat only boiler which was more than adequate for the heating and hot water demands. This was to be a direct swap with his existing boiler in the kitchen.
Some of the pipework in the airing cupboard had to be altered to suit the new boiler, we also fitted a Greenstar system filter to protect the boiler. All the other controls were left the same, the system was powerflushed and an inhibitor was put into the system to condition and protect the water. All in all, the work took about a day to complete. New Worcester Boiler in Ascot
Mr T will now get an 10 years manufacturer backed guarantee from Worcester and peace of mind his boiler will be good for years. New Worcester boiler in Ascot.
If you would like us to provide a free quotation for a New Worcester boiler in Ascot, contact us now at [email protected]