We conducted a thorough survey and confidently selected the Worcester Greenstar 24RI heat-only boiler, which fully met the heating and hot water demands. This was a straightforward direct replacement.
Some pipework in the airing cupboard had to be altered to suit the new boiler. We also fitted a Greenstar system filter to protect the boiler. All the other controls were left the same. The system was power flushed, and an inhibitor was put into it to condition and protect the water. Overall, the new boiler in Maidenhead took about one day to complete.
We also fitted out their new cloakroom.
They will now receive a 10-year manufacturer-backed guarantee from Worcester, providing peace of mind that their boiler will be reliable for years.